AODA Alliance Seeks a Meeting with the Metrolinx CEO

Accessibility for Ontarians with Disabilities Act Alliance Update

United for a Barrier-Free Ontario for All People with Disabilities

Website: www.aodaalliance.org

Email: aodafeedback@gmail.com

Facebook: https://www.facebook.com/aodaalliance

Twitter: @aodaalliance

YouTube: https://www.youtube.com/user/aodaalliance

TikTok @AODAAlliance

 

AODA Alliance Seeks a Meeting with the Metrolinx CEO

 

November 19, 2026

 

SUMMARY

 

On November 19, 2026, AODA Alliance Chair David Lepofsky wrote Metrolinx CEO Michael Lindsay. Read this letter below. It responds to Mr. Lindsay’s September 17, 2026 letter to the AODA Alliance, in which Metrolinx agrees to our request for an independent external accessibility audit of the two new Toronto light rail transit lines, the Eglinton Crosstown (Line 5) and Finch West (Line 6).

 

In this new letter, we request a follow-up meeting with the Metrolinx Chair. An earlier meeting was held last June with AODA Alliance Chair David Lepofsky, the President of the Alliance For Equality of Blind Canadians Marcia Yale and the CEO of Balance for Blind Adults, Michelle McQuigge.

 

In this letter, we applaud Metrolinx for agreeing to engage an external accessibility audit of Lines 5 and 6. We call for its final report to be made public and to be fully arms-length from Metrolinx, and for it to be conducted by a qualified accessibility expert.

 

Our letter also seeks Mr. Lindsay’s clarification of Metrolinx’ reasons for failing to install an elevator in the renovated Finch West station for passengers with disabilities to go up from the Line 6 LRT platform to the Line 1 subway platform. The AODA Alliance’s 5-minute video released last summer revealed that the ramp which Metrolinx installed instead of an elevator is truly the stupidest ramp in the world.

 

How You Can Help

MORE DETAILS

 

November 19, 2026 Letter from AODA Alliance Chair David Lepofsky to Metrolinx CEO Michael Lindsay

Accessibility for Ontarians with Disabilities Act Alliance

United for a Barrier-Free Society for All People with Disabilities

Web: www.aodaalliance.org Email: aodafeedback@gmail.com Twitter: @aodaalliance

 

November 19, 2026

 

To: Michael Lindsay, President & CEO

Via email: michael.lindsay@metrolinx.com

Metrolinx Corporation

97 Front Street West

Toronto, Ontario M5J 1E6 Canada

 

Re: Accessibility Barriers Facing Passengers with Disabilities on the New Eglinton Crosstown Transit Line (Line 5) and the Finch West Transit Line (Line 6)

 

Dear Sir,

 

Thank you so much for your September 17, 2026, letter. It is very positive that Metrolinx has agreed to an independent accessibility audit of Toronto’s Line 5 (Eglinton Crosstown) and Line 6 (Finch West). We applaud that decision.

 

It will be very important for any report by that accessibility audit to be made public. The auditing organization should be given complete access to the accessibility advice that Metrolinx got from any source on this project. Metrolinx should not attempt to have the final report’s text modified before it is released.

 

As well, we encourage you to select an organization with a proven expert track record for such accessibility audits. While we don’t recommend any specific provider, we caution that we have publicly criticized the Rick Hansen Foundation’s so-called accessibility “certification” as seriously problematic and deficient.

 

I would very much welcome a follow-up meeting with you, along with my colleagues from the Alliance for Equality of Blind Canadians and Balance for Blind Adults. Your leadership on this can make a real and positive difference.

 

Unless I am not reading it correctly, your September 17, 2026, letter suggests that Metrolinx installed no elevator in the Finch West station for passengers with disabilities to get from the Line 6 platform to the Line 1 platform because of advice from the TTC and its Advisory Committee on Accessible Transit (ACAT). You wrote:

 

“With respect to the connection between Line 1 and Line 6 at Finch West Station, the design was developed in consultation with TTC and ACAT. In lieu of an elevator connection, TTC required that an accessible ramp connection be provided between Line 6 and Line 1. Through the consultation process, a gradual sloped walkway was identified as the preferred accessible solution for the station environment.

 

Ultimately, as you can see, none of these were made by Metrolinx in isolation.”

 

We’d very much like to see the content of that advice, because it is frankly shocking that any of those sources would give Metrolinx that advice. We’d especially like to know who at TTC specifically took that position with Metrolinx, and on what grounds.

 

I look forward to hearing from you.

 

Sincerely,

 

David Lepofsky CM, O. Ont

Chair, Accessibility for Ontarians with Disabilities Act Alliance

Twitter: @davidlepofsky

 

CC: Marcia Yale, President, AEBC president@blindcanadians.ca

Michelle McQuigge, CEO, Balance for Blind Adults m.mcquigge@balancefba.org